View from the Whittemore Gulch Trail in Purisima Creek Redwoods Preserve. (Haley Edmonston)

Purisima-to-the-Sea Trail and Parking Area

When built, the long-envisioned Purisima-to-the-Sea Trail will link the California Coastal Trail to the Bay Area Ridge Trail, allowing open space visitors to travel on trail between the Pacific Ocean, through grassy ridgelines, canyons and forests, to the ridgeline of the Santa Cruz Mountains.

The Purisima-to-the-Sea Trail will eventually be part of the larger 40-mile Bay-to-Sea Trail, an envisioned but not yet realized regional trail that would connect the San Francisco Bay to the Pacific Ocean.

Work started in early 2021 to begin planning the Purisima-to-the-Sea Trail and parking area. There will be multiple opportunities throughout the project for public input. To stay informed, please sign up for our email list below.

Image
Public Access, Education, and Outreach
Public Access
Image
illustration of the sun setting over hills
Coastside

VIRTUAL PUBLIC MEETING DEC. 1, 2021: PROJECT VISION & GOALS

Join Midpen to learn about a multiyear process to plan for a long-envisioned regional trail connecting Purisima Creek Redwoods Open Space Preserve to the California Coastal Trail, and improve parking capacity for this preserve in the coastal area.

At this meeting, Midpen staff will present the project’s opportunities and constraints analysis and draft vision and goals. The public is invited to join the discussion during breakout sessions. Staff will also present an update on a separate but parallel project, the Purisima Multimodal Access Study, which is identifying strategies to manage parking and visitation demand at this popular preserve.

Visit openspace.org/board-meetings for instructions on attending and/or providing comment. Details for this item will be posted by Friday, November 26.

 

Project Components

The specific components of the Purisima-to-the-Sea Trail and parking area project are:

  • Approximately 5 miles of new trail linking to the existing Purisima Creek Redwoods Open Space Preserve trail system.
  • New parking area and trailhead.
  • Connector and roadway trails linking to the California Coastal Trail.

This project creates an opportunity to create improved parking capacity for coastal and preserve access in the area.

Stay informed!

Sign up to receive notifications about projects at Purisima Creek Redwoods Preserve.

Planning Process

The multi-year planning process will include identifying the project goals in alignment with Midpen's coastal mission, a feasibility study and robust community engagement with project stakeholders. Conceptual designs would then need to go through an environmental review and public process followed by design development, permitting and construction. 

Image
Funded by Measure AA 2014 Open Space Bond

Funding

Planning the Purisima-to-the-Sea Trail is possible thanks to the support of local voters, and public and nonprofit conservation partners, including:  

Peninsula Open Space Trust (POST): Midpen's public-private partnership with POST enabled the open space land required for the trail to be preserved over many years.

California Coastal Conservancy: Awarded Midpen a $300,000 grant to fund the initial feasibility studies in 2021. Future grants to support the project will be sought. 

Measure AA: 30-year, $300 million bond passed by local voters in 2014 to support Midpen’s community-created Vision Plan top 25 priority projects, including this one.

Timeline

2004Midpen boundaries expand to include the San Mateo County Coast after a vote by residents.
2004-2020Midpen works in a public-private partnership with POST preserving a corridor of open space from Purisima Creek Redwoods Preserve to the coast. 
2021-2022PHASE 1: Feasibility studies and public planning process with support from Coastal Conservancy grant and Measure AA funds.
Spring 2021Opportunities and constraints analysis, technical studies and focus groups. 
Dec. 1, 2021Public Workshop: Presentation of opportunities and constraints, identification of project goals and scope with Midpen board of directors. (Agenda, staff report and minutes)
2022 (TBD)Public Committee Meeting: Review draft conceptual design options with Midpen board committee. 
2022 (TBD)Public Board Meeting: Review draft conceptual design options with Midpen board of directors.
PHASE 2Environmental review and public comment process.
PHASE 3Design development and permitting.
PHASE 4 Construction.

 

Image
Timeline graphic